Upgraded Roofs for Applebrook Carriage Homes | Malvern, PA

Entryway sign for Applebrook Carriage Homes in Malvern, PA, marking the community where roof replacement project was completed
Share this post

Exterior Renovation Project Overview:
Applebrook Carriage Homes in Malvern, PA

Lemus Construction completed a comprehensive roof replacement project at Applebrook Carriage Homes in Malvern, PA. The project ran from September 8th through December 12th and included full removal of existing roofing, structural inspections, sheathing repairs, flashing upgrades, and installation of a new high-performance roofing shingles and ventilation.

Working closely with the HOA and consulting engineers, our team delivered a durable, code-compliant roof system designed to protect the community for years to come. This case study highlights the project scope, key materials and systems, execution strategy, and collaborative approach that ensured timely completion with minimal disruption.

Applebrook Carriage Homes roofing replacement timeline showing all units in sequential order of work execution, Malvern PA
Roofing crew removing old shingles at Applebrook Carriage Homes, Malvern PA
Lemus Construction team installing new shingles on Applebrook roofs, Malvern PA
Completed roof sections with Lemus Construction crew on-site, Applebrook Carriage Homes, Malvern PA

Building Smarter

Subscribe for Project Insights & Updates

Get the latest tips, project highlights, and financing updates delivered straight to your inbox. Stay ahead with expert guidance from Lemus Construction for multi-family and commercial properties.

Related articles

Mary and J.
4 years ago
Lemus Construction replaced my roof, skylights, and my attic ventilation. They also resided my home. I was so pleased with the quality of their work! They showed up on time, was very clean with all their materials, and the quality of their workmanship was first to none. I will not have anyone else do work on my house. A superb company with excellent workers. And all the work comes with their guaranteed warranty.
Response from the owner:Hi, Mary and John. We appreciate the kind words and are glad we could provide you with a positive experience!
Frederman H.
4 years ago
Response from the owner:Thank you for the positive rating, Frederman!
Peter S.
3 years ago
Our Management firm has worked with Lemus on various projects over the last 10 years, ranging from full roof and siding replacements on multi-family Condominiums (consisting of 246, 184, 136, and 76 units) to structural facade renovations, window replacements, roof repairs, and everything in between. Not only have we at RCR Management been extremely satisfied with their work quality and response time, but so have the many unit-owners we represent. This company is built on a strong foundation of respectful and caring people, which starts at the top with Victor and Mario. We highly recommend them for any exterior project you may be considering!
Response from the owner:Peter, Thanks for taking the time to submit a great review! Your feedback means the world to us and we really appreciate your kind words. It's always great to receive recognition and your support is invaluable.
Greivin F.
7 years ago
Response from the owner:Thank you for your rating Greivin!
Eileen G.
4 years ago
I am a member of the board for an adult condo community. It was time to replace the roofs/gutters and trim. A MASSIVE project. We vetted 6 vendors. We interviewed, read proposals, asked questions, etc etc. LEMUS continually impressed us with their professionalism, responsiveness and cooperation. We are halfway through a 2 year project. The residents can't say enough positive things about the management, crew, etc. They are honest and VERY easy to work with. Go LEMUS
Response from the owner:Hi Eileen, we are tremendously grateful for your positive feedback! We hope to continue serving you and appreciate you taking the time to share your rating with us.
G.T. A.
4 years ago
Response from the owner:Hi, G.T. We really appreciate the 5-star rating, and are so glad we could provide you with a great experience!
Peter S.
4 years ago
Response from the owner:Hi, Peter. We really appreciate the 5-star rating, and are so glad we could provide you with a positive experience!
Melis S.
5 months ago
Excellent roofing contractor. Especially for HOA's. They are responsive and friendly. The project manager was very detailed.
Response from the owner:Appreciate the review, Melis! It’s always a pleasure to hear such praise of our team members. We’re glad our responsiveness & communication stood out, and that the project management process felt clear and detailed. Working with HOA communities takes a lot of coordination, so we value that feedback. Thanks again for the support & the opportunity to work with you!
Anne M.
8 months ago
The merchants were very knowledgeable, explaining everything from the construction of the windows themselves to the installation process. The workman was knowledgeable, efficient and meticulous. He was polite and easy to work with. The installation was seamless from start to finish. One of the supervisores came out to check his work. I will definitely hire them again and refer them to others.
Response from the owner:Thanks for sharing Anne! We’re glad the whole process was smooth & we strive to deliver the utmost care & attention to all our work so everyone can be just as satisfied as you. Thanks again for the trust and for recommending us. We’d be happy to help anytime.
Marilu S.
4 years ago
Response from the owner:Hi Marilu, we are so grateful for your 5-star review. Thanks for sharing your rating with us and the community.
Martha A.
9 years ago
Response from the owner:Hi Martha! Thank you for your rating, feel free to reach out if you need anything else.
Howard A.
9 years ago
Professional, good prices and workmanship that is second to none! Everyone is friendly and work gets done on time and on budget.
Response from the owner:Hi Howard, we strive to provide the highest level of service possible. Thank you for taking the time to share your experience!
Scott P.
9 years ago
Response from the owner:Hi Scott, thank you for the rating! Please feel free to call our office if you need anything in the future.
Alex K.
4 years ago
Absolutely the best in the business!! I’m amazed by the quality of workmanship and how professional everyone has been from start to end with my home project. Thank you Mr. Lemus for such a wonderful job done. I’m a customer for life!!!
Response from the owner:Hi, Alex. Your feedback is highly appreciated. Thank you so much for the review and we look forward to more home projects with you in the future!
Bryan B.
6 years ago
Response from the owner:Hi Bryan, thank you for your feedback! We are glad you enjoyed your experience with us.
Judith M.
4 years ago
Response from the owner:Hi Judith, we really appreciate you taking the time to share your rating with us. We look forward to serving you again in the future.
Many M.
3 years ago
Great contractor! They strive for customer service and quality work!
Response from the owner:Thank you so much for your kind words! We’re thrilled to hear our team’s focus on customer service and quality made a difference. It was a pleasure working with you, and we truly appreciate your support!
Roxanne K.
2 years ago
The crew did a job to repair water damage. They were very thorough, neat and went above and beyond to make the repair.
Response from the owner:Hi Roxanne, thank you for the kind review! We love hearing that our crew went above and beyond to ensure your comfort and satisfaction. Any business would be proud to receive that kind of feedback, and we're no exception. We truly appreciate you taking the time to share your experience.
Fran H.
1 year ago
We had a disastrous situation by a previous contractor (I'd love to name them but won't) on our commercial roof. We were expecting a full replacement would be needed. Victor met with us on site. We walked the entire roof and he pointed out the problem spots and explained in detail, the work that would be needed to remedy our issues. His estimate was very fair and he was up front about some potential additional work that might be needed that could not be determined at the time of the survey. Those costs came in at a minimum when the work was done. Lemus's professionalism & craftsmanship was incredible from the start of the process to the end. Our issues are completely resolved and we are no longer worried every time it rains!
Response from the owner:Hi Fran, we’re so happy to hear this feedback! From the start, our goal was to provide you with a clear, honest assessment of your commercial roof and create a repair plan that would last. Victor’s walkthrough, pointing out problem spots and explaining the process, is exactly how we strive to keep homeowners and property owners informed every step of the way. We’re proud that our roofing team delivered quality craftsmanship that not only fixed the issues but also brought back your peace of mind. You’ve been a pleasure to work with, and we’re truly grateful for your support and trust in Lemus Construction.
Gamboa C.
2 years ago
Response from the owner:Hi Gamboa, Thank you for your 5 star review! We’re so proud of what we do, and it’s amazing to know that our hard work was noticed and valued. We can't express our gratitude enough.
Rob N.
1 year ago
Lemus descended upon our townhome community to replace our long lived roofs. The crew did everything they possibly could to protect gardens, screens, windows, etc. They worked incredibly quickly and efficiently. As part of their charge they repaired areas of damage when they found such, they brought areas around windows and chimneys into spec, and they connected exhaust vents and replaced skylights while making sure the attics vented properly through the gable vents and soffits. We also had very nice 6 inch gutters and downspouts installed. After each section they did the best they could to remove scattered nails both by hand and with strong rolling magnets. You know how you can tell a project went well? When you meet and become friendly with the crew. For instance: Harry R. Caesar Robin Pablo Carlos Christian Jesus Jose Mario... If you're looking at a roof project certainly give Lemus Construction a shot at providing a proposal.
Response from the owner:Rob, thank you for such a thoughtful and detailed review! It was a true pleasure working with your community on this roof replacement project. We’re so glad to hear that the crew’s care and repairs stood out to you. We’ll be sure to pass along your kind words to Harry, Caesar, Robin, Pablo, Carlos, Christian, Jesus, Jose, and Mario—they’ll be thrilled to know their hard work left such a positive impression. Thank you again for trusting Lemus Construction with your roofing, skylight, chimney, and gutter needs. We’re proud to help keep your community protected for years to come!
Mafer R.
4 years ago
I strongly recommend and encourage anyone looking for siding and deck replacement to contact Lemus Construction. They did a great job with my siding and provided the right price for the quality and service they offer. Their customer service was beyond professional.
Response from the owner:Thank you so much for taking the time to leave an excellent rating. We really appreciate your business. Please let us know what we can do for you in the future.
Marsie G.
4 years ago
This is the second time we've had Lemus do work on our house, and we will have them back again. Honest, hard workers that do top quality work.
Response from the owner:Hi Marsie, we are immensely grateful for your kind words! We strive to provide the highest level of service possible. Thank you for your continued loyalty and support.
Kimberly K.
3 years ago
From start to finish it was a great experience working with Lemus. The windows and sliding door look great. José was professional and his team was skilled, and Josie made the process fast and easy.
Response from the owner:Hi, Kimberly. We're delighted to hear that you had a great experience working with Lemus! From start to finish, it's wonderful to know that our team, led by José, provided professional and skilled service. We're glad you're satisfied with the windows and sliding door, and we appreciate your kind words about Josie, who made the process fast and easy for you. Thank you for choosing our services, and we hope to assist you again in the future if needed.
Patti W.
4 years ago
Response from the owner:Hi, Patti. We really appreciate the rating, and are glad we could provide you with a positive experience!