Heights at Haledon:
Five Buildings, 27 Homes, One Exterior Standard
Project Timeline: April 6, 2026 – August 14, 2026
Our Heights at Haledon siding replacement renewed five condominium buildings and 27 individual homes across Heights Drive and Skyline Drive in Haledon, New Jersey. We worked with Cedarcrest Property Management, KIPCON, and the Heights at Haledon COA while Project Managers Jeffery Jones and Milton Aguilar coordinated demolition, engineered field reviews, new siding, trim, soffits, gutters, chimney components, inspections, resident notices, equipment, and daily cleanup. The primary exterior selection was CertainTeed Monogram® Double 5-inch vinyl siding in Sable Brown, paired with new supporting components intended to give the buildings one cleaner, more consistent exterior system instead of treating siding as an isolated cosmetic upgrade. CertainTeed Monogram® siding
Heights at Haledon is an established attached-home and condominium neighborhood in Passaic County. Current community listings describe a suburban development of condominium and townhouse-style residences, with homes commonly arranged as substantial multi-level units and many properties carrying attached garages, decks, and association-maintained exterior elements. That architecture made the project less about covering five flat walls and more about working through a collection of corners, roof transitions, windows, decks, utilities, and occupied entrances without losing the character of the neighborhood beneath the new siding.
Starting With Five Buildings, Not Five Copies of the Same Building
Our estimating and preconstruction teams began by walking Buildings 2 through 6 and reviewing how each exterior was actually put together. We looked at existing siding and trim, soffits, rooflines, chimneys, gutters, downspouts, entrances, windows, decks, landscaping, driveways, utility penetrations, equipment access, and the spaces available for dumpsters and material staging. Twenty-seven units may share an association, but the conditions around each elevation still develop their own personality after years of weather, repairs, landscaping, and ordinary use.
Those observations moved through our estimating, office, project-management, and field teams before active demolition began. Photographs, measurements, engineer requirements, permit information, building sequencing, resident-access concerns, and anticipated repair procedures became part of the production plan Jeffery and Milton used onsite. Our commercial and multifamily siding services are built around that process because a large exterior project gets difficult quickly when the crew is asked to discover the building one wall at a time.
The scope also required us to think beyond the visible siding. New vinyl soffits, gutters, downspouts, trim, fascia and rake conditions, chimney chase covers, sheathing, framing, and insulation could all intersect with the work depending on what became visible after the original exterior was removed. The siding gets the color selection and the finished photographs, but the quieter components around it usually determine whether the wall behaves when the weather stops being cooperative.
KIPCON and the Conditions Behind the Existing Exterior
KIPCON provided engineering support for the remediation program. Its siding and facade practice focuses on evaluating common exterior components, identifying deterioration, and helping associations understand where facades sit within their service life and maintenance cycle. KIPCON specifically identifies weather damage, warping, buckling, cracking, moisture, and material deterioration among the conditions that can affect community facades over time.
That engineering role became particularly important once existing materials came off. The contract allowed for documented unit-price repairs if concealed sheathing, framing, insulation, fascia, rake, or related conditions were discovered and authorized during construction. We did not need to assume every opened wall contained a major problem, but we did need a process for the occasions when the wall had something worth saying.
The Borough inspector established a practical review path for those conditions. Our project notes called for a brief engineer report for each building, with additional Borough attention if significant framing repairs were uncovered, followed by final inspection of the completed work. That kept field discoveries documented without turning every ordinary piece of exterior work into a committee meeting beside a dumpster.
Working With Cedarcrest Property Management
Cedarcrest Property Management served as the management connection between the association, residents, KIPCON, and our construction team. Cedarcrest specializes in New Jersey condominium and HOA management and describes its approach as hands-on property oversight with regular site inspections, contractor coordination, financial administration, and communication with boards and homeowners. That experience gave us a management partner accustomed to the practical side of moving construction through an occupied condominium property.
Ben Raneri worked as the Cedarcrest contact while our field and office teams managed building schedules, notices, access questions, inspections, and project updates. Start notices were hand delivered before active work reached residents, giving homeowners time to prepare outdoor areas and understand when construction would arrive at their building. There was no separate project portal or project booklet for this job, which made straightforward communication between Cedarcrest, the association, and our team even more important.
Residents continued living in the community throughout the project. Cars still had to leave garages, packages still arrived, decks and sidewalks still existed beneath work areas, and nobody’s calendar suddenly cleared because siding crews showed up. The point of planning was not to make construction invisible, which would have been a fairly ambitious promise, but to keep the interruption organized and moving.
Handling Haledon Permits and Inspections
New siding in Haledon requires municipal permitting, so our team worked through the Borough’s construction process before and during the exterior replacement. The Borough of Haledon Building-Construction Code Office administers the New Jersey Uniform Construction Code locally and specifically lists installation of new siding among the projects requiring a building permit. The Borough also requires approved plans and permits to remain available onsite until work is complete and final approvals have been obtained.
Those requirements became part of the project schedule rather than an administrative task sitting outside it. Engineering reports, framing questions, final inspections, and permit closure had to follow the buildings as the physical work progressed. A beautiful facade with unfinished municipal records is still an unfinished project.
By August 14, final inspection had been completed and the project permits were closed. That gave the physical siding program a clean municipal finish after the last building work and remaining corrections had been addressed. There are more exciting things to photograph than a closed permit, but boards generally appreciate it when the paperwork has the same ending as the construction.
Building a Jobsite Around 27 Occupied Homes
The site needed enough temporary infrastructure to support crews without swallowing the community. ProGreen supplied two portable restrooms and two 30-yard dumpsters, while an 8-by-16-foot storage container gave the field team a secure place for tools, materials, and daily project needs. A JCB telehandler was also deployed to support material movement as work advanced through the five buildings.
None of that equipment belongs in the finished project photographs, which is exactly the point. Dumpsters, toilets, storage containers, lifts, and delivery areas are temporary tools, not permanent community amenities. We want them close enough to make the crews efficient and controlled enough that residents are not navigating a construction yard every time they leave home.
The temporary jobsite moved with production wherever practical. Active demolition, siding material, crew vehicles, and disposal were concentrated around the current buildings instead of spreading across all 27 units at once. A five-building job becomes much easier to live beside when residents can see that the construction zone has a beginning, a direction, and eventually an end.
Removing the Existing Siding and Looking at the Wall Beneath It
Siding replacement becomes more informative the moment the old material leaves the wall. Until then, estimators and engineers can inspect visible symptoms, review openings, study transitions, and make reasonable assessments, but concealed conditions remain concealed for a reason. Once the exterior opened, our crews could see the substrate supporting the new system and compare actual field conditions against the approved project requirements.
The contract created a defined process for concealed sheathing, framing, insulation, fascia, rake, and similar repairs when they were discovered. Any necessary additional work had to be documented and authorized rather than quietly disappearing beneath the new siding. That protects the association financially and gives the engineer a cleaner record of what was actually repaired.
It also protects the exterior itself. CertainTeed’s installation guidance makes an important point that gets lost in discussions about siding colors: vinyl siding is not a watertight exterior by itself and should be installed over a properly prepared wall with appropriate weather protection and flashing around windows, doors, and penetrations. A new facade performs best when the wall beneath it has been treated like part of the project instead of something nobody wants to discuss.
Installing CertainTeed Monogram® in Sable Brown
The association selected CertainTeed Monogram® Double 5-inch siding in Sable Brown as the primary new cladding. Monogram is CertainTeed’s premium vinyl siding line, available in traditional clapboard and Dutch lap profiles and designed around a reinforced locking system, low-gloss woodgrain appearance, and low-maintenance exterior performance. CertainTeed currently lists RigidForm™ reinforcement, its CertaLock™ locking system, and a lifetime limited manufacturer warranty among the product line’s features, although Heights at Haledon’s final project-specific warranty documentation should control any coverage language used on the published case study.
The Double 5-inch profile gave the buildings a traditional horizontal rhythm while Sable Brown brought a deeper, warmer exterior color to the community. On five substantial attached buildings, consistency mattered from one elevation to the next, particularly around corners, windows, garage areas, roof transitions, decks, and changes in wall plane. A premium material does not help much if one building looks carefully planned and the next one looks like the crew changed its mind halfway around the corner.
Jeffery, Milton, and our field leadership monitored alignment, fastening, trim integration, penetrations, and the transitions surrounding the siding as production advanced. Vinyl needs room to move as temperatures change, so correct installation matters beyond what can be judged from a photograph. The objective was a finished exterior that looked intentional in August and still behaved correctly when North Jersey temperatures dropped months later.
New Soffits and the Details at the Roof Edge
The work included new vinyl soffits in addition to the siding and trim replacement. Soffits occupy the underside of the roof overhang, where they help finish the exterior and, when designed as part of the ventilation strategy, can contribute to airflow at the roof edge. They also happen to sit exactly where siding, fascia, roof edges, gutters, and trim begin running into one another.
Those intersections needed to look clean across all five buildings. A wall can carry hundreds of square feet of perfectly aligned siding and still look unfinished if the final few inches beneath the roofline wander around. That is why we treated the soffit and trim work as part of the new facade rather than the leftovers after the main panels were installed.
The same approach applied to fascia and rake conditions discovered during construction. Where authorized repairs were required, they had to be resolved before adjacent components could reach their final position. Installing finished material over an unresolved edge just guarantees that somebody gets to take the finished material back off later.
Replacing 6-Inch Gutters and 3-by-4-Inch Downspouts
The project also included new 6-inch gutters and 3-by-4-inch downspouts. That drainage scope connected the siding remediation to the roof runoff moving past the walls, giving the association an opportunity to improve how water is collected and directed away from the exterior. Our gutter and drainage services follow the same basic rule: water management does not end when water reaches the edge of the roof.
Gutter installation had to coordinate with the fascia and surrounding exterior details rather than racing ahead of them. The project record shows that a repair at Unit 402 was completed on July 31, one of the remaining details handled before final inspection and permit closure. Small punch-list items like that are exactly why “almost done” and “done” deserve different entries in the schedule.
Residents and management should treat the new drainage system as part of the siding investment. Overflowing gutters can stain siding, keep wall areas wet, damage fascia, create ice at entrances, and undermine landscaping below. A new wall system performs better when the roof runoff is not repeatedly being thrown against it.
Stainless-Steel Chimney Chase Covers
Another specialized part of the contract involved scheduled one-pipe and two-pipe chimney chase covers fabricated from 18-gauge 304 stainless steel. Chimney chase covers sit high on the building, outside the usual line of sight, but their job is simple and unforgiving: keep rain and debris from entering the framed chase below. They belong in the same exterior conversation as siding and flashing because moisture entering from above rarely respects the boundary between one scope and another.
Stainless steel provides a durable material for those exposed locations, particularly compared with aging covers that may have corroded or lost their ability to shed water correctly. The covers still need proper fit, slope, penetrations, and installation details to perform as intended. Expensive metal installed badly is still badly installed metal.
Including the chimney work while access and exterior crews were already mobilized also reduced the need for a separate future construction event around those buildings. This is one of the quieter advantages of a coordinated capital project. When related exterior components have reached the same point in their service life, dealing with them together can make more sense than inviting scaffolding and lifts back every year for another isolated repair.
Closing Each Building Before Closing the Entire Project
The contract used a building-by-building payment structure rather than one simple deposit and final balance. Buildings 2 through 6 each created a progress checkpoint, with billing tied to satisfactory completion, inspection, contract compliance, and association review. The agreement also allowed a 10% retainage to remain until the full project, punch list, and required closeout documentation reached final acceptance.
That structure created a useful discipline for the field operation. One building could not simply be declared finished because the crews had moved their ladders to the next one. Inspection, corrections, documentation, and acceptance remained part of what “complete” actually meant.
By August 14, the onsite work had reached that point, with final inspection completed and the permits closed. Final billing was also recorded as complete, while the project tracker still awaited its formal closeout package and warranty entries. The construction noise is finished; the paperwork still deserves to finish just as carefully.
What Residents Should Expect From the New Exterior
Residents should expect the completed buildings to carry a more consistent Sable Brown appearance, updated soffits and trim, renewed drainage, and improved exterior details around the areas included in the remediation. They should not assume that vinyl siding, gutters, or chimney covers become maintenance-free simply because they are new. Wind, impacts, landscaping, drainage problems, and later contractors remain fully capable of creating future issues.
Residents can help by reporting cracked or displaced panels, loose trim, staining, unusual gutter overflow, open joints, or changes around windows and doors before those conditions become larger repairs. Cameras, decorations, satellite components, hose reels, and other attachments should not be drilled through association-maintained siding or trim without approval. One fastener in the wrong location can create a remarkably patient path for water.
CertainTeed recommends cleaning vinyl siding with a garden hose, mild soapy water, and a soft-bristle brush. The manufacturer specifically advises against power washing vinyl or polymer siding because high pressure can force moisture behind the panels or cause damage and discoloration, and recommends routine cleaning about once per year depending on conditions. The pressure washer may feel more satisfying, but the wall is not there for anybody’s entertainment.
How Cedarcrest and the COA Can Protect the Investment
For Cedarcrest and the association, the completed project should become a new building-by-building maintenance baseline. Each of the five buildings should have a record containing contract documents, KIPCON reports, permits, inspection approvals, photographs, approved product information, chimney-cover details, gutter records, authorized concealed repairs, punch lists, and eventual warranty documents. Twenty-seven homes are manageable when the records are organized and surprisingly mysterious when everything is stored under a folder called “siding.”
Exterior inspections should be scheduled periodically and after severe wind, hail, tree impact, or other unusual weather. Reviews should include siding, trim, soffits, flashing, roof-to-wall transitions, chimney covers, gutters, downspouts, wall penetrations, and the lower edges of the facade. KIPCON’s facade guidance similarly emphasizes ongoing review because exterior cladding remains a significant common element even after replacement.
Landscaping and irrigation deserve attention as well. Shrubs and vines should not remain pressed against siding, mulch and soil should not be allowed to bury the bottom of exterior components, and sprinklers should be adjusted when they repeatedly soak the walls. CertainTeed also recommends monitoring siding for cracks, warping, gaps, and damage around openings while keeping gutters and downspouts functioning properly.
Management should control future penetrations through the facade. Cable, security, HVAC, electrical, pest-control, and communications contractors should document what they are attaching, where they are attaching it, and how the water-management details will be restored afterward. The easiest hole to troubleshoot five years from now is the one somebody bothered to photograph when they made it.
Five Buildings Later, the Exterior Becomes a Maintenance Plan
The Heights at Haledon project brought together five buildings, 27 homes, CertainTeed Monogram Double 5-inch Sable Brown siding, new soffits, 6-inch gutters, 3-by-4-inch downspouts, stainless-steel chimney chase covers, KIPCON engineering, Cedarcrest management, Borough permits, resident notices, concealed-condition repairs, heavy equipment, and building-by-building acceptance. Jeffery, Milton, our estimating staff, office team, crews, management partners, and engineers each had a role in keeping those pieces moving until the final inspection and permit closeout were complete. The Sable Brown siding is the part everybody sees, but the exterior works because the less obvious pieces were treated like they mattered too.
For the association, the job now shifts from construction to stewardship. Gutters need cleaning, walls need periodic review, landscaping needs control, later penetrations need documentation, and any small damage should be handled before it develops into a larger facade problem. That work is quieter than siding replacement and considerably cheaper than doing siding replacement again.
Heights at Haledon now joins our growing portfolio of completed community exterior projects throughout New Jersey and the Mid-Atlantic. Associations planning siding, roofing, gutters, windows, decks, chimney work, or broader exterior remediation need a contractor prepared to manage the building envelope and the people living behind it at the same time.
Planning a siding replacement or another exterior capital project for your condominium, HOA, townhome, or multifamily community? Contact Lemus Construction to discuss your buildings, engineering requirements, resident communication, drainage, inspections, warranty documentation, and long-term exterior plan.