Highlands at Glenmoor 2026 Roof Replacement

Community Roofing Replacement at Highlands at Glenmoor
Share this post

The Highlands at Glenmoor:
39 Buildings, 60 Homes, and Another 230,000 Square Feet Done Right

Project Timeline: February 16, 2026 – August 1, 2026

Community Roofing Replacement at Highlands at Glenmoor
Community Roofing Replacement at Highlands at Glenmoor
Community Roofing Replacement at Highlands at Glenmoor

Our Highlands at Glenmoor roof replacement renewed approximately 2,300 roofing squares, or about 230,000 square feet, across 39 buildings serving 60 Phase 2 units in Palmer Township near Easton, Pennsylvania. Daniel Arias led the project in the field while our estimating, office, customer-service, and production teams coordinated with KIPCON, the association, and property management through months of roofing, homeowner selections, permits, inspections, equipment movement, ventilation corrections, drainage work, and closeout. The new roofing uses GAF Timberline HDZ® shingles in Barkwood, backed by a GAF Golden Pledge® warranty program, with the 2026 scope carrying forward the kind of community-wide planning required when the roof work alone covers nearly a quarter-million square feet. GAF Timberline HDZ Barkwood

This was the Phase 2 roof-remediation program, covering 60 homes spread across 39 scheduled buildings rather than a single uninterrupted row of identical units. The contract work included complete roof removal, deck review and authorized repairs, new leak protection, underlayment, flashing, plumbing and radon penetrations, ventilation components, and other roof details required by KIPCON’s project manual. An executed addendum then expanded the drainage side of the work across all 96 units included in Phases 1 and 2, giving the larger Glenmoor roofing program one coordinated gutter and downspout standard.

That scale changes the nature of the job. A small roof can survive a fair amount of informal communication because everybody can usually see what is happening from the same parking space. Thirty-nine buildings require a plan, records, homeowner communication, engineering coordination, and a field team that knows what comes next before the current roof is finished.

 

Starting With KIPCON’s Plan and Our Own Site Study

The work began before bundles were loaded onto a roof. Our estimating and preconstruction teams walked the scheduled buildings, reviewing existing roof conditions, valleys, walls, plumbing penetrations, radon components, skylights, sun tunnels, attic ventilation, roof-mounted equipment, gutters, access routes, parking, landscaping, staging areas, and the places where construction would have to share space with residents. The engineering documents told us what needed to be accomplished, while those site visits told us how the work would actually fit into Glenmoor.

KIPCON provided the technical framework for the remediation and remained part of the approval process as buildings moved through completion. Its contract-administration work for community associations includes ongoing inspections, review of construction against specifications, and punch-list development, which is exactly the kind of structure a project this large benefits from. We want the engineering requirements understood before a crew reaches a condition, not reconstructed from memory while the roof is open and the weather app is getting interesting. KIPCON Contract Administration

Our own estimating information, photographs, building notes, homeowner records, material requirements, and internal handoff were then moved into Daniel’s production plan. That gave the field team something more useful than a total square count and a stack of drawings. Our multifamily and condominium roofing services are built around that transition from estimating to production because the larger the project becomes, the less forgiving it is when important information stays in somebody’s head.

 

One Community, 39 Different Roofs to Manage

The Highlands at Glenmoor roofing scope covered 39 buildings, but that does not mean we encountered one roof design 39 times. Each building carried its own collection of penetrations, skylights, vents, drainage paths, homeowner-installed components, landscaping, parking conditions, and previous repairs. Similar construction makes production more efficient, but familiarity is useful only if it does not turn into assumption.

The project had to move building by building while still operating as one coordinated capital program. Materials needed to arrive in the right sequence, residents needed notice, homeowner-specific roof items needed decisions before demolition, and KIPCON needed a clear path for reviewing work as it progressed. A schedule this large works best when the next several buildings are already being prepared while the active one is still under construction.

That sequencing also helped us keep the property from becoming one enormous construction yard. Completed areas could return to normal while equipment and crews shifted into the next active group. Residents were going to live with a large roofing project for months, but there was no reason all 39 buildings needed to look under construction at the same time.

 

Organizing the Jobsite for 230,000 Square Feet

The field operation required its own temporary infrastructure. Project records show Redbox handling dumpster support, United Site Services providing the portable restroom, and multiple JCB telehandlers along with an Equipter supporting material and debris movement over the course of construction. Those machines do not make the roof better by themselves, but they allow thousands of square feet of material to move without turning every bundle and every piece of tear-off into a manual trip through occupied spaces.

The equipment also had to move with the project rather than simply settle into the most convenient parking spaces for four months. Roofing materials, waste, delivery trucks, crew vehicles, resident cars, and common-area access all compete for the same finite amount of pavement. Daniel’s field coordination had to keep the machines useful without letting the machines become the project.

Daily cleanup mattered for the same reason. A condominium community is not a remote construction site that can sit untouched until Monday morning, and residents still need to walk, drive, receive deliveries, and use their homes after our crews leave for the day. Nails, packaging, damaged wood, old shingles, and loose material needed a controlled route off the buildings and out of the community.

 

Removing the Existing Roof and Seeing What Was Actually There

The base remediation called for complete removal of the existing roofing so the new system could begin at the roof deck. That gave our crews access to concealed conditions that cannot be responsibly evaluated through a layer of old shingles and underlayment. Where deck deterioration appeared, the project had an established process for documented and authorized repairs before new materials covered the area again.

This is one of the moments where roofing stops being theoretical. A roof can look tired from the ground for years, but once it is stripped, the plywood, penetrations, ventilation paths, flashing conditions, and old repairs get a chance to speak for themselves. Sometimes they are polite about it; sometimes they have apparently been waiting years for an audience.

Our job was to address the conditions the contract and engineering documents required without turning normal field review into a license to invent scope. Necessary repairs needed to be identified, documented, approved where required, and completed before the roofing assembly moved forward. The finished shingles only make sense when the surface beneath them is worth protecting.

 

Building the New GAF Roofing System

The association selected GAF Timberline HDZ® in Barkwood for the 2026 phase. GAF describes Barkwood as a rich neutral designed to evoke natural wood tones, with brown shading that works comfortably against beige, cream, gold, taupe, and other warm exterior palettes. In a community with dozens of separate rooflines, that kind of restrained color choice helps the buildings read as one property instead of asking each roof to become the main event. GAF Barkwood Roof Shingles

Timberline HDZ is GAF’s architectural shingle platform using LayerLock® technology and its enlarged StrikeZone® nailing area. GAF’s current technical information also identifies qualifying Timberline HDZ products with Class A fire performance and current impact-resistance testing, but the broader point at Glenmoor was not to install one premium shingle and consider the job finished. The field shingles had to work with the leak barriers, deck protection, flashing, ventilation, ridge components, and penetrations specified around them. GAF Timberline HDZ Roofing

The Phase 2 scope specified GAF WeatherWatch® and StormGuard® leak-protection components along with Tiger Paw™ roof-deck protection, new flashing, and related system accessories. Different roof areas face different water pressures, particularly around eaves, valleys, penetrations, and transitions, so the system had to be installed by location rather than by the theory that more product automatically means more protection. The useful roof is the one where every layer knows what job it is there to do.

 

Barkwood Across 39 Buildings

Color consistency becomes more important as the number of buildings increases. One slightly different roof on a single-family street can disappear into the neighborhood; a community capital project should look like the association made one deliberate decision. Barkwood gave Glenmoor a consistent warm-neutral roofline across the 2026 phase while still allowing the architecture, siding, brick, trim, and landscaping to carry their own visual weight.

That consistency depended on field workmanship as much as product selection. Course alignment, ridge lines, edges, transitions, penetrations, flashing, and the finish around accessories needed to stay disciplined from the first building to the thirty-ninth. Months of repetition can make a crew faster, but it can also tempt people to believe they have seen every possible condition already.

Daniel and our field teams kept building-level review tied to the production schedule so familiar details did not become casual details. The final building deserved the same roof standard as the first one, even if everybody involved could install Barkwood in their sleep by then. Repetition should build consistency, not complacency.

 

Ventilation Was Part of the Roof, Not an Afterthought

The scope included new ridge ventilation, static louvers, and other ventilation components where specified. Roof ventilation sits mostly out of sight once construction is finished, which means it receives far less attention from residents than the new shingle color. Heat and moisture remain considerably less impressed by curb appeal.

The project also addressed attic-fan conditions under the association’s current rules. Existing attic fans were removed as part of the roofing work, with electrical termination handled according to the project process, while homeowners wanting different future equipment had to follow the community’s requirements. This reduced the number of active roof penetrations and kept ventilation decisions connected to the engineered roofing system rather than allowing old equipment to dictate the new roof layout.

Future managers should preserve those ventilation records by building. A contractor arriving several years from now needs to know why a vent exists, why another one was removed, and how the attic was intended to move air after the 2026 work. Otherwise, the next improvement can accidentally undo the one everyone already paid for.

 

Bathroom, Dryer, Kitchen, and Radon Penetrations

Roof penetrations were another substantial part of the Phase 2 work. The base scope addressed plumbing and radon boots, bathroom and dryer vent caps, kitchen vent terminations, and other specified penetrations, while deficient homeowner-owned vent conditions could require additional correction. Each opening through the roof creates another place where roofing, flashing, mechanical systems, and homeowner responsibility meet within a few inches.

The internal homeowner guidance specifically addressed vents found to be improperly connected or terminating incorrectly. Those conditions needed to be corrected during reroofing rather than sealed back beneath a finished system and left for somebody else to discover later. The roof was already open, which is generally the best time to stop sending warm, moist air somewhere it was never supposed to go.

For long-term maintenance, these penetrations deserve their own place in the inspection routine. Pipe boots, exhaust caps, radon penetrations, and mechanical terminations experience different movement and wear than the surrounding shingles. A 230,000-square-foot roofing program can still develop a leak at a detail small enough to cover with one hand.

 

Coordinating Skylights and Sun Tunnels With Homeowners

Skylights and sun tunnels added a homeowner-specific layer to the project. The association roofing contract did not simply absorb every private opening into one community price, so affected owners received selection and financial-responsibility information before their building reached production. That kept individual decisions from becoming last-minute field questions after demolition had already begun.

The CST identifies VELUX skylight and sun-tunnel options, with fixed and venting configurations coordinated to the existing opening sizes. VELUX’s current deck-mounted skylight systems are designed to integrate directly with the roof deck and flashing system, which makes reroofing the logical time to coordinate replacement rather than cutting into a newly completed roof later. VELUX Deck-Mounted Skylights

Homeowners could also elect approved abandonment of certain skylight openings rather than replacement, with the opening closed as part of the roofing process and interior finishing remaining their responsibility. The important part was that an old skylight could not simply be ignored while a new warrantied roof was constructed around an uncertain opening. Penetrations require decisions; roofs dislike ambiguity.

 

Resident Communication Before the Crew Reached the Building

Homeowner forms were distributed, and start notices were hand-delivered before roofing reached the affected homes. The internal communication plan called for residents to receive notice several days before work began at their unit, giving them time to move vulnerable outdoor items, handle skylight-shade requirements, and prepare vehicles for nearby tear-off. That does not eliminate construction disruption, but it gives people a fighting chance to plan around it.

The roofing operation was designed to remain exterior-focused, without routine access through living spaces. Attic access needed for specified work could be handled from the roof rather than turning each home into an interior construction route. That matters at a community scale because sixty separate appointments inside sixty homes would create an entirely different logistical project.

Residents were also told that demolished roof areas had to be left weather-tight at the end of the working day. That is not an ambitious customer-service promise; it is a basic requirement of responsible roofing. Production counts only after the building is ready to survive the night.

 

Roofing Around Satellite Dishes and Heating Coils

Years of occupancy add things to roofs that were never part of the original construction drawings. Satellite dishes, heating coils, fans, cables, and homeowner-installed equipment slowly accumulate until reroofing forces everyone to decide what still belongs there. Glenmoor’s 2026 project addressed those components through association rules and homeowner responsibility rather than automatically reinstalling everything in the same place.

The homeowner guidance required roof-mounted satellite equipment to be removed and handled under the association’s relocation rules rather than simply drilled back through the new roofing. Heating coils followed a similar controlled process, with future reinstallation subject to community approval. Those rules reduce the number of uncontrolled penetrations going back into a system everyone has just spent substantial time and money replacing.

That policy is worth preserving after construction. A new roof can survive decades of weather and still be defeated surprisingly quickly by somebody with a drill, a tube of sealant, and absolute confidence that the association will never need to know. Roof access works better when permission and documentation come before the hole.

 

Replacing the Community’s Gutters and Downspouts

The executed 2026 addendum expanded the project beyond the Phase 2 roofs themselves. New 6-inch K-style seamless gutters with hidden hangers and 3-by-4-inch downspouts were specified across all 96 Phase 1 and Phase 2 units, replacing the smaller existing drainage components. That created a consistent drainage standard across the broader roofing program instead of leaving the new roofs to discharge into a patchwork of older systems.

The difference matters when thousands of square feet of roof are concentrating rainwater at the eaves. Larger gutters and downspouts still require correct pitch, secure attachment, clear outlets, and sensible discharge locations, but they give the community a drainage system designed around the renewed roofs above them. Our gutter and drainage services follow the same principle: getting water off a roof is only the first half of the trip.

For management, gutter maintenance should now be treated as part of the roofing investment rather than a separate housekeeping item. Leaves, debris, loose outlets, damaged leaders, and poor discharge can create staining, icing, erosion, wet siding, and water problems below a roof that is otherwise performing correctly. Gravity will happily move the water wherever the building lets it.

 

Palmer Township Permits and the Last Administrative Mile

Our office handled the permitting process with Palmer Township, where reroofing is specifically listed among projects requiring permits under the Township’s administration of the Pennsylvania Uniform Construction Code. Palmer’s Codes and Zoning Department processes permit applications and construction requirements, making the municipal record another part of the building-by-building closeout rather than paperwork detached from the actual roofing. Palmer Township Building Codes and Permits

The project tracker shows permits received overall, with Buildings 149 and 170 still carrying pending items in the current record. Final inspections also remained to be scheduled as the project moved into punch-list and administrative closeout. That distinction matters because the schedule records field completion on August 1, but the complete project file still needs every remaining permit, inspection, warranty, and release document to catch up with the roofs.

We do not need to pretend those two dates are the same. Construction can be complete onsite while closeout continues behind the scenes, particularly across dozens of buildings. A finished roof is the physical result; a finished project includes the paper trail proving how it got there.

 

GAF Golden Pledge® Protection

The Highlands at Glenmoor project is documented with GAF Golden Pledge® warranty coverage, and the warranty submission is already recorded as submitted and uploaded. For condominium, townhome, multifamily, and other non-single-family-detached structures, GAF’s current Golden Pledge materials describe a 40-year manufacturing-defect warranty term, a 25-year upfront non-prorated coverage period, and up to 25 years of GAF-backed workmanship coverage, subject to the registered warranty’s requirements, products, and exclusions. GAF Golden Pledge for Commercial and Multifamily Properties

That enhanced coverage is another reason the roof has to be thought of as a system. Golden Pledge eligibility depends on qualifying GAF materials, installation requirements, and certified-contractor participation rather than simply installing Timberline shingles and stapling a warranty brochure to the invoice. The underlayment, leak protection, ventilation, accessories, installation, and closeout documentation all become part of the same conversation.

The association should retain the final registered warranty certificate by building or project phase with the permanent closeout records. Our roof warranty guidance provides broader context, but the issued Glenmoor Golden Pledge documentation should control any future warranty decision. Marketing copy is useful; the certificate is what matters when somebody actually needs coverage.

 

Building-by-Building Approval Kept the Project Accountable

The contract tied billing to satisfactory completion at the building level, with association and engineer review before each completed-building invoice moved forward. A holdback remained in place until the broader project, required warranties, cleanup, lien documentation, damage resolution, and other closeout requirements reached final acceptance. We do not need to publish the financial details to appreciate what that structure did for the field operation.

It created a clear definition of progress. A building was not complete simply because the crew had shifted ladders to the next address. Workmanship, engineering review, cleanup, documentation, and corrections all had to follow.

That is a useful discipline on a long project because momentum can make unfinished details feel smaller than they are. The thirty-ninth building still needs a punch list even when everybody can already see the end of the summer. Close enough has a way of becoming permanent once the equipment leaves.

 

What Residents Should Expect From the Completed Roofs

Residents should expect a more consistent Barkwood roofline, renewed weather protection, updated roof penetrations, improved ventilation where included, and a drainage system coordinated with the larger roofing program. They should not expect the buildings to become maintenance-free simply because the capital project is complete. Wind, trees, ice, drainage debris, mechanical work, animals, and time continue operating without reference to the project schedule.

Residents can help most by reporting changes early. New ceiling staining, unusual skylight moisture, displaced shingles, loose flashing, gutter overflow, vent problems, or visible storm damage should be reported to management instead of investigated from a ladder. The association needs a good observation far more than it needs a resident conducting an unscheduled roof inspection.

Homeowners should also continue following community rules before installing or altering rooftop equipment. Satellite systems, heating equipment, solar components, mechanical work, and other exterior modifications can affect flashing, drainage, ventilation, and manufacturer warranty rights. The safest penetration is the one reviewed before anyone makes it.

 

How Management Can Extend the Life of the 2026 Investment

The association and MRH Enterprise should carry the project forward as a building-specific maintenance program, not one enormous folder labeled “2026 roofs.” Each building record should include the KIPCON specifications, permits, inspection approvals, approved GAF products, Golden Pledge documentation, photographs, deck repairs, ventilation changes, vent corrections, homeowner skylight or sun-tunnel decisions, gutter records, punch lists, and later service history. Thirty-nine buildings are manageable when the records know where they belong.

Professional roof inspections should be scheduled periodically and after major wind, hail, falling limbs, heavy snow, or ice events. Reviews should include shingles, flashing, valleys, ridge ventilation, static vents, pipe and radon boots, exhaust caps, skylights, sun tunnels, roof edges, gutters, downspouts, and locations altered by another contractor. The large Barkwood fields will be the easiest part to see and often the least complicated part of the inspection.

Drainage deserves its own maintenance schedule now that the larger gutter and downspout program has established one community standard. Gutters should be kept clear, leaders should remain securely connected, and discharge points should be watched for recurring erosion, staining, icing, or ponding. One blocked outlet can make a very large new roof look guilty of a problem it did not create.

Management should also maintain a roof-access log by building. The date, contractor, reason for access, photographs, penetrations, and repairs should be recorded whenever another trade works on the system. People change jobs; the roof should not be expected to remember for them.

 

39 Buildings Later, the Work Becomes Stewardship

The 2026 Highlands at Glenmoor phase brought together 39 buildings, 60 Phase 2 homes, approximately 2,300 roofing squares, roughly 230,000 square feet of roof surface, GAF Timberline HDZ Barkwood shingles, Golden Pledge coverage, KIPCON engineering, VELUX homeowner selections, ventilation corrections, roof-penetration work, new community-wide gutters and downspouts, Palmer Township permits, resident notices, heavy equipment, and months of building-by-building coordination. Daniel, our estimating team, office staff, customer-service team, roofing crews, KIPCON, property management, the association, and the residents all had a role in keeping those pieces aligned. The Barkwood roofs are what people will notice first, but the hidden work around airflow, drainage, penetrations, deck conditions, and documentation is what turns a large replacement into a long-term capital improvement.

The project schedule records onsite completion on August 1, with remaining punch-list, inspection, permit, and administrative closeout moving behind it. That is the point where construction starts getting quieter, and ownership becomes more important. The next useful work will be inspection, gutter cleaning, documentation, controlled roof access, storm review, and handling small changes before they become another major project.

The Highlands at Glenmoor 2026 phase now joins our growing portfolio of completed community roofing projects throughout Pennsylvania, New Jersey, and the Mid-Atlantic. Associations planning multi-building roof replacement need more than shingles and manpower; they need a team prepared to work through engineering, homeowner decisions, permits, drainage, ventilation, warranty requirements, daily access, and the hundreds of small details living between the first building and the last.

 

Planning a roof replacement, gutter program, or another exterior capital project for your condominium, HOA, townhome, or multifamily community? Contact Lemus Construction to discuss your buildings, engineering requirements, phasing, resident communication, manufacturer warranties, drainage, and long-term exterior plan.

Building Smarter

Subscribe for Project Insights & Updates

Get the latest tips, project highlights, and financing updates delivered straight to your inbox. Stay ahead with expert guidance from Lemus Construction for multi-family and commercial properties.

Related articles

Aaron K.
2 days ago
Lemus Construction has been a pleasure to work with. Their team is great to do business with, and the entire process from communication to equipment purchases has always been smooth and straightforward. We truly value the relationship we've built and appreciate the opportunity to work with such a great company. We look forward to continuing our partnership!
Response from the owner:Thank you, Aaron! We truly appreciate the kind words and feel the same about working with you and the entire team. Great partnerships are built on good communication, trust, and having the right people in your corner. We're grateful for the relationship we've built and look forward to many more years of working together!
Nick G.
4 years ago
Our continued experiences with the Lemus Construction team have been fantastic. We continue to use them on all of our exterior building envelope projects. Quality work with good communication every time!
Response from the owner:Hi, Nick. We are delighted that you had a great experience with us. Thank you for taking the time to rate us!
Alex R.
1 year ago
Acabo de remodelar mi casa hicieron un gran trabajo
Response from the owner:Gracias, Alex. Nos alegra saber que quedó satisfecho con el trabajo de remodelación. Fue un placer trabajar en su hogar y agradecemos la confianza que depositó en nuestro equipo.
Bruce E.
10 months ago
The Lemus crew was quick and efficient. They protected the house and surrounding landscaping while removing the old roof. They repaired the rotting wood and finished off the project making the roof look better than it did when new. They installed a more efficient ridge vent as well as improved soffit vents to address to old roof's insufficient ventilation and moisture issues. None of the other roofing companies that quoted the job offered these solutions, even though they were aware of our moisture problem. I was impressed with the Lemus team's knowledge of roofs and the products available to address ventilation/moisture issues. Our attic no longer has that stale, musty smell from accumulated moisture, plus the roof looks great.
Response from the owner:Thanks for the support & letting us work on your home Bruce! It was our honor and we appreciate you for taking the time to share such a detailed review. We're glad the team was able to address the ventilation and moisture concerns & it means a lot to hear that the results are already making a difference. We truly value your trust with Lemus Construction & don't hesitate to reach out for any concerns or future projects. Best, The Lemus Team
Rosetta K.
4 years ago
Very friendly and helpful customer service. Roofing repair supervisor explained the process and kept me informed with drone pictures. Lemus was on time and completed project earlier than expected. They also left my property in pristine condition. The only indicator they were there was a beautiful new roof and a small Lemus sign. I plan to use Lemus again and recommend them to friends and family. :)
Response from the owner:Hi Rosetta, thank you for taking the time to share your experience with us. We appreciate your business and value your feedback. If there is anything else we can do for you, please let us know!
Jill G.
4 years ago
I am the manager of a condominium association in Lansdale, Pa. We just finished a 7-year roof and gutter replacement project with Lemus Construction. After bidding this project out and meeting with all the bidders, we knew that Lemus was the contractor. The crews are the hardest working people, very respectful, and experienced. Lemus helped us through this project during COVID, inflation, and unexpected circumstances. The adminstrative team and owners are excellent. They met with the Residents each year with powerpoint presentations and answered all their questions to ease their concerns. We sent surveys out each year, and the results were outstanding. I would highly recommend Lemus for your roofing and gutter replacements. They also did some siding repair for us along the way. I cannot say enough about Lemus. Thank you for making my job easy.
Response from the owner:Hi, Jill. We really appreciate the kind words and are so glad we could provide you with a positive experience!
Roxanne
4 years ago
This is the 3rd time we have worked with Lemus for a new roof. Very happy with their work. Professional and efficient. We found a couple of things that needed to be tweaked, and they did not hesitate to take care of them ASAP. I highly recommend them.
Response from the owner:Thank you so much for your continued loyalty Roxanne! We are always at your service.
Lisa S.
1 year ago
I can’t say enough good things about Chris, JJ and the contractors who replaced my roof. Chris showed up at 7am to accommodate my work schedule, had a quote to me within a couple of hours and answered any and all questions. JJ was amazing at sharing the progress and issues that were found, took care of remediating everything and finished timely. The area was clean of debris. He pulled the permits for me, worked with my HOA and was available for any question
Response from the owner:We can’t thank you enough for this wonderful review. Chris and JJ always go above and beyond to make sure our homeowners feel supported throughout the entire roofing process. It’s great to hear everything from scheduling to cleanup was handled to your satisfaction and we'll be sure to pass along your good graces to the team. Thanks for choosing Lemus!
Henry R.
1 month ago
Great company kudos to Annette and chris service is there middle name
Response from the owner:Thanks Henry! Always a pleasure!
Bernie O.
1 year ago
Lemus approach to our GLV Roofing Project has been spot on from daily management to workers endurance in exceptional heat, especially on the roofs when the heat registered at 130 degrees. I can verify that my Copperfield neighbors came to the aid of Ken’s roofers and ground help. We refilled Gatorade, lemonade, watermelon, cookies, zucchini loaf and even had a chance to treat all of the ground crew to warm sandwiches of BBQ and salad. The crew is respectful and considerate and they clean up every evening. This is just my message but I am sure so many other folks feel so much the same way.
Response from the owner:Hi Bernie, thank you so much for your kind words. We’re thrilled to hear that you’re satisfied with our work and management on the GLV Roofing Project. It’s great to know the crew’s hard work and endurance didn’t go unnoticed, especially in those extreme heat conditions. We appreciate the community support from Copperfield neighbors—it truly makes a difference for our team. Thanks again for your thoughtful feedback!
Rob N.
1 year ago
Lemus descended upon our townhome community to replace our long lived roofs. The crew did everything they possibly could to protect gardens, screens, windows, etc. They worked incredibly quickly and efficiently. As part of their charge they repaired areas of damage when they found such, they brought areas around windows and chimneys into spec, and they connected exhaust vents and replaced skylights while making sure the attics vented properly through the gable vents and soffits. We also had very nice 6 inch gutters and downspouts installed. After each section they did the best they could to remove scattered nails both by hand and with strong rolling magnets. You know how you can tell a project went well? When you meet and become friendly with the crew. For instance: Harry R. Caesar Robin Pablo Carlos Christian Jesus Jose Mario... If you're looking at a roof project certainly give Lemus Construction a shot at providing a proposal.
Response from the owner:Rob, thank you for such a thoughtful and detailed review! It was a true pleasure working with your community on this roof replacement project. We’re so glad to hear that the crew’s care and repairs stood out to you. We’ll be sure to pass along your kind words to Harry, Caesar, Robin, Pablo, Carlos, Christian, Jesus, Jose, and Mario—they’ll be thrilled to know their hard work left such a positive impression. Thank you again for trusting Lemus Construction with your roofing, skylight, chimney, and gutter needs. We’re proud to help keep your community protected for years to come!
Craig B.
5 years ago
Good work and service
Response from the owner:Craig, thank you for taking the time to provide your feedback! Let us know if we can ever be of further service to you.
Al R.
4 years ago
Lemus construction did an amazing job on our home. The project included a new roof, new sky lights, new siding, new trim, and a new composite deck. This was an extensive project, yet all of the work was completed within the timelines and budget as quoted. The crews were friendly and courteous and left the worksite tidy after each workday. A very competent foreman was on site directing the work each day. We can't say enough about how happy and satisfied we are with Lemus Construction and their beautiful restoration of our home!
Response from the owner:Hi Mr.Rauch, Thank you so much for taking the time to leave an excellent rating. We really appreciate your business. Please let us know what we can do for you in the future.
Guerin H.
5 years ago
Servicio profesional
Response from the owner:Hi Guerin, Thank you for your positive feedback! We are at your service.
craig P.
7 months ago
The best in the business. The projects with Lemus are always on time and on budget and with minimal disruption for our residents. Highly recommend these professionals!
Response from the owner:Appreciate the feedback Craig. We value our partnership & look forward to more successful work together for many years to come.
Mary and J.
4 years ago
Lemus Construction replaced my roof, skylights, and my attic ventilation. They also resided my home. I was so pleased with the quality of their work! They showed up on time, was very clean with all their materials, and the quality of their workmanship was first to none. I will not have anyone else do work on my house. A superb company with excellent workers. And all the work comes with their guaranteed warranty.
Response from the owner:Hi, Mary and John. We appreciate the kind words and are glad we could provide you with a positive experience!
Neal H.
4 years ago
On time, on budget— and no issues once they wrapped up. Guys were great. I highly recommend this company.
Response from the owner:Hi Neal, Thank you so much for your 5-star review! We will share this with the our team to let them know to keep up the amazing work.
Shekeira A.
4 years ago
The job was done efficiently the outcome was beautiful! The crew was respectful and clean. Lemus is a great company to work with.
Response from the owner:Hi, Shekeira. We are delighted that you had a great experience with us. Thank you for taking the time to rate us and leave your kind words!
Suhas S.
4 years ago
We were very pleased with Lemus Construction. They were very efficient and friendly from the giving quote, to planning the project, and executing the project. Everything was handled professionally. Definitely recommend them!!
Response from the owner:Hi Suhas, thank you for your kind words! We are immensely grateful for your support.
Kevin B.
4 years ago
Lemus is the number 1 company in this area. They are fast, responsive, courteous, clean, and willing to work with any request you may have. I would highly recommend this company for any home renovation or repair!
Response from the owner:Hi, Kevin. We really appreciate the kind words about our company and are so glad we could provide you with a positive experience! We strive to provide our best service for customers like you.
Andy M.
10 months ago
I was completely impressed with their professionalism and customer service .
Response from the owner:Thanks, Andy, we truly appreciate your review and love that our customer service team was able to help you to create a professional and positive outcome on your home improvement!
Michelle S.
3 years ago
Excellent to work with from start to finish! True craftsmen! Very professional- beautiful job!
Response from the owner:Hi Michelle! Thank you for leaving a review. We are honored and humbled by your kind words and look forward to being your go-to for future construction projects you may have.
Frederman H.
5 years ago
Response from the owner:Thank you for the positive rating, Frederman!
Many M.
3 years ago
Great contractor! They strive for customer service and quality work!
Response from the owner:Thank you so much for your kind words! We’re thrilled to hear our team’s focus on customer service and quality made a difference. It was a pleasure working with you, and we truly appreciate your support!
Andrew J.
12 months ago
The foreman and workers were efficient and polite. They told us everything they were doing and got it done in a reasonable time. Very good company, would highly recommend them
Response from the owner:Thanks for the support Andrew! We love to hear of our teams excellence and efficiency & glad that we kept the consistent & clear communication. It is important to us that every homeowner knows exactly what is happening during their project, and I am glad our methods kept you well informed. We are grateful for the recommendation and are always here if you need anything in the future.